INFRASTRUCTURE
- Project : Civil Works Hermosa Hotel Karen
- Category : Infrastructure
-
About This Project
This involved designing the civil works for the surface water and foul water for the hotel and the cottages. A u-drain was designed around the hotel to take the surface water to the road drain. The foul water reticulation was designed to be taken to a reinforced concrete bio-digester. The water is treated and later used for watering the landscaped areas.